Beer

??????Authorized by the relevant departments, GDE has elaborated Design Standard of Brewery, Design Standard of Malthouses and other design manuals. Through all these years, we have built long-term partnership with a great number of well-known beer companies at home and abroad. Our clients include Tsingtao Brewery, AB Inbev, China Resources Snow Breweries, Zhujiang Brewery, Kingway Brewery, Carlsberg, Yanjing Beer, Asia Pacific Brewries and Kirin Beer, etc.

Guangzhou Nansha Pearl River Beer Co., Ltd Annual 300,000 kL Beer Production Line Relocation Project

Location:Time:

The relocation project locates in Nansha Development Zone, Guangzhou. Annual capacity is expected to be 1.3 million kL beer. The design and construction of main workshop have been accomplished at a time and equipment will be moved phase by phase, where the 1st phase relocation leads to annual capacity 300,000 kL beer.
New technologies, such as no-soil filtration, automatic warehouse, flexible packaging line, low energy consumption saccharification are adopted.
Design began on Aug, 2011; construction started on Jan, 2013; Phase 1 works was completed on Sep, 2015; and relocation was completed in 2016.
Project Awards:
Guangdong Province 2019 Zhan Tianyou Hometown Cup Prize;
First Prize of 2019 Excellent Engineering in Light Industry

China Resources Snow Brewey( Sichuan) CO.ltd

Location:ChengduTime:2007

The feasibility report, scheme design and work drawing for relocation and new build 600000 KL beer/year project.

 

Guangzhou Nansha Pearl River Beer Co., Ltd Annual 300,000 kL Beer Production Line Relocation Project

Location:Time:

The relocation project locates in Nansha Development Zone, Guangzhou. Annual capacity is expected to be 1.3 million kL beer. The design and construction of main workshop have been accomplished at a time and equipment will be moved phase by phase, where the 1st phase relocation leads to annual capacity 300,000 kL beer.
New technologies, such as no-soil filtration, automatic warehouse, flexible packaging line, low energy consumption saccharification are adopted.
Design began on Aug, 2011; construction started on Jan, 2013; Phase 1 works was completed on Sep, 2015; and relocation was completed in 2016.
Project Awards:
Guangdong Province 2019 Zhan Tianyou Hometown Cup Prize;
First Prize of 2019 Excellent Engineering in Light Industry

China Resources Snow Brewey( Sichuan) CO.ltd

Location:ChengduTime:2007

The feasibility report, scheme design and work drawing for relocation and new build 600000 KL beer/year project.

 

Guangzhou Asia Pacific Brewery Co., Ltd.

Location:Huangpu District, GuanzghouTime:-

Area covered: about 125,868 square meters (188.8 mu);
Floorage: 57,089 square meters;
Green area: 37,144 square meters;
Description: The buildings of this project include: brew comprehensive building, facilities, packing house, office building, building for life service, wastewater treatment station, bicycle shed and so on.

Tsingtao Brewery (Fuzhou) Plant

Location:FuzhouTime:2004

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Guangzhou Asia Pacific Brewery Co., Ltd.

Location:Huangpu District, GuanzghouTime:-

Area covered: about 125,868 square meters (188.8 mu);
Floorage: 57,089 square meters;
Green area: 37,144 square meters;
Description: The buildings of this project include: brew comprehensive building, facilities, packing house, office building, building for life service, wastewater treatment station, bicycle shed and so on.

Tsingtao Brewery (Fuzhou) Plant

Location:FuzhouTime:2004

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Anheuser-Bush (Foshan) Brewing CO.ltd

Location:FoshanTime:2008-2009

The primary design and work drawing for the second continuation.

China Resources Snow Brewery(LiuAn) Co.,Ltd.

Location:Liu an(Anhui)Time:2007-2008

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project.

Anheuser-Bush (Foshan) Brewing CO.ltd

Location:FoshanTime:2008-2009

The primary design and work drawing for the second continuation.

China Resources Snow Brewery(LiuAn) Co.,Ltd.

Location:Liu an(Anhui)Time:2007-2008

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project.

Beijing Yanjing Beer Group Corporation

Location:BeijingTime:-

The primary design, scheme design and work drawing for the Hi-tech Bacteria-free treatment and filling equipment technique improvement project: Pure draft beer 60000kl/year, beer 200000t/year, malt 200000t/year.

Kingway Brewery(ChenDu) Co.,Ltd.

Location:ChengduTime:2006

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 100000KL beer annual.

Beijing Yanjing Beer Group Corporation

Location:BeijingTime:-

The primary design, scheme design and work drawing for the Hi-tech Bacteria-free treatment and filling equipment technique improvement project: Pure draft beer 60000kl/year, beer 200000t/year, malt 200000t/year.

Kingway Brewery(ChenDu) Co.,Ltd.

Location:ChengduTime:2006

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 100000KL beer annual.

HeBei ZhuJiang Brewery Co.,Ltd.

Location:Lu quan(Hebei Province)Time:2007

The feasibility report, scheme design and work drawing for the new build 100000 KL beer/year project.

ZhanJiang ZhuJiang Brewery Co.,Ltd.

Location:Zhan jiangTime:2005

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project; 2008: 50000bottle/hr filling production line design.

HeBei ZhuJiang Brewery Co.,Ltd.

Location:Lu quan(Hebei Province)Time:2007

The feasibility report, scheme design and work drawing for the new build 100000 KL beer/year project.

ZhanJiang ZhuJiang Brewery Co.,Ltd.

Location:Zhan jiangTime:2005

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project; 2008: 50000bottle/hr filling production line design.

ZhongShan ZhuJiang Brewery Co.,Ltd.

Location:ZhongshanTime:2005

The feasibility report, scheme design and work drawing for the first item of 100000 KL beer/year project (storage, filtration, package and related civil facilities).

DongGuan ZhuJiang Brewery Co.,Ltd.

Location:Dong GuangTime:2004

The feasibility report, scheme design and work drawing for the new build 200000 KL beer/year project.

ZhongShan ZhuJiang Brewery Co.,Ltd.

Location:ZhongshanTime:2005

The feasibility report, scheme design and work drawing for the first item of 100000 KL beer/year project (storage, filtration, package and related civil facilities).

DongGuan ZhuJiang Brewery Co.,Ltd.

Location:Dong GuangTime:2004

The feasibility report, scheme design and work drawing for the new build 200000 KL beer/year project.

Tsingtao Brewery(ChengDu)Co.,Ltd.

Location:Chengdu Time:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Tsingtao Brewery(YuLin)Co.,Ltd.

Location:Yulin(shanxi) Time:2005

The primary design and work drawing for the expanding plan of 100000 KL beer/year project.

Tsingtao Brewery(ChengDu)Co.,Ltd.

Location:Chengdu Time:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Tsingtao Brewery(YuLin)Co.,Ltd.

Location:Yulin(shanxi) Time:2005

The primary design and work drawing for the expanding plan of 100000 KL beer/year project.

Tsingtao Brewery(Jinan)Co.,Ltd.

Location:JinanTime:2006

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Tsingtao Brewery(XuZhou)Co.,Ltd.

Location:XuzhouTime:2005

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Tsingtao Brewery(Jinan)Co.,Ltd.

Location:JinanTime:2006

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Tsingtao Brewery(XuZhou)Co.,Ltd.

Location:XuzhouTime:2005

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Kingway Brewery(FoShan) Co.,Ltd.

Location:FoShanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Kingway Brewery(DongGuan) Co.,Ltd.

Location:DongguanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project; 200000KL beer annual project.

Kingway Brewery(FoShan) Co.,Ltd.

Location:FoShanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Kingway Brewery(DongGuan) Co.,Ltd.

Location:DongguanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project; 200000KL beer annual project.

Kingway Brewery(XiAn) Co.,Ltd.

Location:XiAnTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Benthanh Brewery Factory,Vietnam

Location:VietnamTime:2007

Kingway Brewery(XiAn) Co.,Ltd.

Location:XiAnTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Benthanh Brewery Factory,Vietnam

Location:VietnamTime:2007

Xinjiang Wusu Beer(WuSu)Co.,Ltd.

Location:Wushu(Xinjiang)Time:2007

The work drawing for the re-constructed 120000KL beer/year project.

Brafaso Brewery Ouagadougou,Burkina Faso

Location:BrafasoTime:2007

100000 kl/year plan( the first phase is 50000kl/year)

Xinjiang Wusu Beer(WuSu)Co.,Ltd.

Location:Wushu(Xinjiang)Time:2007

The work drawing for the re-constructed 120000KL beer/year project.

Brafaso Brewery Ouagadougou,Burkina Faso

Location:BrafasoTime:2007

100000 kl/year plan( the first phase is 50000kl/year)

Luoyang Asia Brewery Co.,Ltd.

Location:LuoyangTime:2006-2007

The feasibility report, scheme design and work drawing for the relocated 200000KL beer/year l project.

Kun Ming Hua Shi Brewery Co.,Ltd.

Location:Kun MingTime:2006

The work drawing for the relocated 120000KL beer annual project.

Luoyang Asia Brewery Co.,Ltd.

Location:LuoyangTime:2006-2007

The feasibility report, scheme design and work drawing for the relocated 200000KL beer/year l project.

Kun Ming Hua Shi Brewery Co.,Ltd.

Location:Kun MingTime:2006

The work drawing for the relocated 120000KL beer annual project.

Sderin Brewery(FuJian) Co.,Ltd.

Location:Futian(Fujian) Time:2005

The feasibility report, scheme design and work drawing for the expanding plan of 50000 KL beer/year project.

Sderin Brewery(FuJian) Co.,Ltd.

Location:Futian(Fujian) Time:2005

The feasibility report, scheme design and work drawing for the expanding plan of 50000 KL beer/year project.

主站蜘蛛池模板: 亚洲va中文字幕不卡无码| 日日摸天天摸人人看| 亚洲人成绝费网站色www| 亚洲人成网站免费播放| 亚洲 欧美 日韩 综合aⅴ视频 | 国产拍揄自揄精品视频| 18禁成年免费无码国产| 久久久久日韩精品免费观看| 亚洲人成在线观看网站无码| 在线观看一区二区三区国产免费| 人与动人物xxxx毛片人与狍| 国产亚洲中文日本不卡二区| 亚洲精品第一区二区三区 | 99精品国产在热久久无毒不卡| 国内综合精品午夜久久资源| 成人午夜看黄在线尤物成人| 亚洲性人人天天夜夜摸| 午夜理论欧美理论片| 国产按头口爆吞精在线视频| 精品国产乱码久久久久久口爆网站 | 久久www成人看片免费不卡| 人人妻人人做人人爽精品| 久久精品国产只有精品66| 国产精品1卡2卡3卡4卡| 欧美另类精品xxxx| 国产亚洲成av人片在线观看导航| 精品久久久久香蕉网| 欧美精品毛片久久久久久久| 久久久久国产精品人妻照片| 国产欧美日韩高清在线不卡| 国产日产韩国精品视频 | 亚洲欲色欲色xxxxx在线观看| 满春阁精品a∨在线观看| 国产亚洲精品一品区99热| 日本免费一区二区三区日本| 日本一区二区三区精品福利视频| 欧美白胖bbbbxxxx| 精品亚洲国产成人蜜臀av| 欧美亚洲日本高清不卡| 牲高潮99爽久久久久777| 一本色道久久88—综合亚洲精品|