Location:HomeCaseBeer

PROJECTS

(86)020-81326513

Beer

??????Authorized by the relevant departments, GDE has elaborated Design Standard of Brewery, Design Standard of Malthouses and other design manuals. Through all these years, we have built long-term partnership with a great number of well-known beer companies at home and abroad. Our clients include Tsingtao Brewery, AB Inbev, China Resources Snow Breweries, Zhujiang Brewery, Kingway Brewery, Carlsberg, Yanjing Beer, Asia Pacific Brewries and Kirin Beer, etc.

Guangzhou Nansha Pearl River Beer Co., Ltd Annual 300,000 kL Beer Production Line Relocation Project

Location:Time:

The relocation project locates in Nansha Development Zone, Guangzhou. Annual capacity is expected to be 1.3 million kL beer. The design and construction of main workshop have been accomplished at a time and equipment will be moved phase by phase, where the 1st phase relocation leads to annual capacity 300,000 kL beer.
New technologies, such as no-soil filtration, automatic warehouse, flexible packaging line, low energy consumption saccharification are adopted.
Design began on Aug, 2011; construction started on Jan, 2013; Phase 1 works was completed on Sep, 2015; and relocation was completed in 2016.
Project Awards:
Guangdong Province 2019 Zhan Tianyou Hometown Cup Prize;
First Prize of 2019 Excellent Engineering in Light Industry

China Resources Snow Brewey( Sichuan) CO.ltd

Location:ChengduTime:2007

The feasibility report, scheme design and work drawing for relocation and new build 600000 KL beer/year project.

 

Guangzhou Nansha Pearl River Beer Co., Ltd Annual 300,000 kL Beer Production Line Relocation Project

Location:Time:

The relocation project locates in Nansha Development Zone, Guangzhou. Annual capacity is expected to be 1.3 million kL beer. The design and construction of main workshop have been accomplished at a time and equipment will be moved phase by phase, where the 1st phase relocation leads to annual capacity 300,000 kL beer.
New technologies, such as no-soil filtration, automatic warehouse, flexible packaging line, low energy consumption saccharification are adopted.
Design began on Aug, 2011; construction started on Jan, 2013; Phase 1 works was completed on Sep, 2015; and relocation was completed in 2016.
Project Awards:
Guangdong Province 2019 Zhan Tianyou Hometown Cup Prize;
First Prize of 2019 Excellent Engineering in Light Industry

China Resources Snow Brewey( Sichuan) CO.ltd

Location:ChengduTime:2007

The feasibility report, scheme design and work drawing for relocation and new build 600000 KL beer/year project.

 

Guangzhou Asia Pacific Brewery Co., Ltd.

Location:Huangpu District, GuanzghouTime:-

Area covered: about 125,868 square meters (188.8 mu);
Floorage: 57,089 square meters;
Green area: 37,144 square meters;
Description: The buildings of this project include: brew comprehensive building, facilities, packing house, office building, building for life service, wastewater treatment station, bicycle shed and so on.

Tsingtao Brewery (Fuzhou) Plant

Location:FuzhouTime:2004

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Guangzhou Asia Pacific Brewery Co., Ltd.

Location:Huangpu District, GuanzghouTime:-

Area covered: about 125,868 square meters (188.8 mu);
Floorage: 57,089 square meters;
Green area: 37,144 square meters;
Description: The buildings of this project include: brew comprehensive building, facilities, packing house, office building, building for life service, wastewater treatment station, bicycle shed and so on.

Tsingtao Brewery (Fuzhou) Plant

Location:FuzhouTime:2004

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Anheuser-Bush (Foshan) Brewing CO.ltd

Location:FoshanTime:2008-2009

The primary design and work drawing for the second continuation.

China Resources Snow Brewery(LiuAn) Co.,Ltd.

Location:Liu an(Anhui)Time:2007-2008

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project.

Anheuser-Bush (Foshan) Brewing CO.ltd

Location:FoshanTime:2008-2009

The primary design and work drawing for the second continuation.

China Resources Snow Brewery(LiuAn) Co.,Ltd.

Location:Liu an(Anhui)Time:2007-2008

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project.

Beijing Yanjing Beer Group Corporation

Location:BeijingTime:-

The primary design, scheme design and work drawing for the Hi-tech Bacteria-free treatment and filling equipment technique improvement project: Pure draft beer 60000kl/year, beer 200000t/year, malt 200000t/year.

Kingway Brewery(ChenDu) Co.,Ltd.

Location:ChengduTime:2006

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 100000KL beer annual.

Beijing Yanjing Beer Group Corporation

Location:BeijingTime:-

The primary design, scheme design and work drawing for the Hi-tech Bacteria-free treatment and filling equipment technique improvement project: Pure draft beer 60000kl/year, beer 200000t/year, malt 200000t/year.

Kingway Brewery(ChenDu) Co.,Ltd.

Location:ChengduTime:2006

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 100000KL beer annual.

HeBei ZhuJiang Brewery Co.,Ltd.

Location:Lu quan(Hebei Province)Time:2007

The feasibility report, scheme design and work drawing for the new build 100000 KL beer/year project.

ZhanJiang ZhuJiang Brewery Co.,Ltd.

Location:Zhan jiangTime:2005

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project; 2008: 50000bottle/hr filling production line design.

HeBei ZhuJiang Brewery Co.,Ltd.

Location:Lu quan(Hebei Province)Time:2007

The feasibility report, scheme design and work drawing for the new build 100000 KL beer/year project.

ZhanJiang ZhuJiang Brewery Co.,Ltd.

Location:Zhan jiangTime:2005

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project; 2008: 50000bottle/hr filling production line design.

ZhongShan ZhuJiang Brewery Co.,Ltd.

Location:ZhongshanTime:2005

The feasibility report, scheme design and work drawing for the first item of 100000 KL beer/year project (storage, filtration, package and related civil facilities).

DongGuan ZhuJiang Brewery Co.,Ltd.

Location:Dong GuangTime:2004

The feasibility report, scheme design and work drawing for the new build 200000 KL beer/year project.

ZhongShan ZhuJiang Brewery Co.,Ltd.

Location:ZhongshanTime:2005

The feasibility report, scheme design and work drawing for the first item of 100000 KL beer/year project (storage, filtration, package and related civil facilities).

DongGuan ZhuJiang Brewery Co.,Ltd.

Location:Dong GuangTime:2004

The feasibility report, scheme design and work drawing for the new build 200000 KL beer/year project.

Tsingtao Brewery(ChengDu)Co.,Ltd.

Location:Chengdu Time:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Tsingtao Brewery(YuLin)Co.,Ltd.

Location:Yulin(shanxi) Time:2005

The primary design and work drawing for the expanding plan of 100000 KL beer/year project.

Tsingtao Brewery(ChengDu)Co.,Ltd.

Location:Chengdu Time:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Tsingtao Brewery(YuLin)Co.,Ltd.

Location:Yulin(shanxi) Time:2005

The primary design and work drawing for the expanding plan of 100000 KL beer/year project.

Tsingtao Brewery(Jinan)Co.,Ltd.

Location:JinanTime:2006

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Tsingtao Brewery(XuZhou)Co.,Ltd.

Location:XuzhouTime:2005

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Tsingtao Brewery(Jinan)Co.,Ltd.

Location:JinanTime:2006

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Tsingtao Brewery(XuZhou)Co.,Ltd.

Location:XuzhouTime:2005

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Kingway Brewery(FoShan) Co.,Ltd.

Location:FoShanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Kingway Brewery(DongGuan) Co.,Ltd.

Location:DongguanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project; 200000KL beer annual project.

Kingway Brewery(FoShan) Co.,Ltd.

Location:FoShanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Kingway Brewery(DongGuan) Co.,Ltd.

Location:DongguanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project; 200000KL beer annual project.

Kingway Brewery(XiAn) Co.,Ltd.

Location:XiAnTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Benthanh Brewery Factory,Vietnam

Location:VietnamTime:2007

Kingway Brewery(XiAn) Co.,Ltd.

Location:XiAnTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Benthanh Brewery Factory,Vietnam

Location:VietnamTime:2007

Xinjiang Wusu Beer(WuSu)Co.,Ltd.

Location:Wushu(Xinjiang)Time:2007

The work drawing for the re-constructed 120000KL beer/year project.

Brafaso Brewery Ouagadougou,Burkina Faso

Location:BrafasoTime:2007

100000 kl/year plan( the first phase is 50000kl/year)

Xinjiang Wusu Beer(WuSu)Co.,Ltd.

Location:Wushu(Xinjiang)Time:2007

The work drawing for the re-constructed 120000KL beer/year project.

Brafaso Brewery Ouagadougou,Burkina Faso

Location:BrafasoTime:2007

100000 kl/year plan( the first phase is 50000kl/year)

Luoyang Asia Brewery Co.,Ltd.

Location:LuoyangTime:2006-2007

The feasibility report, scheme design and work drawing for the relocated 200000KL beer/year l project.

Kun Ming Hua Shi Brewery Co.,Ltd.

Location:Kun MingTime:2006

The work drawing for the relocated 120000KL beer annual project.

Luoyang Asia Brewery Co.,Ltd.

Location:LuoyangTime:2006-2007

The feasibility report, scheme design and work drawing for the relocated 200000KL beer/year l project.

Kun Ming Hua Shi Brewery Co.,Ltd.

Location:Kun MingTime:2006

The work drawing for the relocated 120000KL beer annual project.

Sderin Brewery(FuJian) Co.,Ltd.

Location:Futian(Fujian) Time:2005

The feasibility report, scheme design and work drawing for the expanding plan of 50000 KL beer/year project.

Sderin Brewery(FuJian) Co.,Ltd.

Location:Futian(Fujian) Time:2005

The feasibility report, scheme design and work drawing for the expanding plan of 50000 KL beer/year project.

主站蜘蛛池模板: 2019午夜三级网站理论| 久久久g0g0午夜无码精品| 欧美日本亚洲韩国一区| 亚洲综合无码明星蕉在线视频| 丝袜自慰一区二区三区| 中文国产乱码在线人妻一区二区| 国产成人av 综合 亚洲| 国产又色又爽又黄的在线观看视频| 国产欧美日韩视频怡春院| 免费无码国模国产在线观看 | 2020久久天天躁狠狠躁夜夜| 一区二区三区在线观看亚洲电影| 97超碰国产精品无码分类| 一区二区三区精品视频日本| 精品国产女主播在线观看| 亚洲精品色播一区二区| 中文字幕乱码一区av久久| 国产精品亚洲专区无码唯爱网| 色午夜日本高清视频www| 国内精品国内自产视频| 欧美人牲交a欧美精区日韩| 丝袜国产一区av在线观看| 日韩人妻无码精品一专区二区三区 | 亚洲宅男精品一区在线观看| 国产69成人精品视频免费| 亚洲精品中文字幕无码av| 国产精品成人a区在线观看| 亚洲一区自拍高清亚洲精品| 久久久久无码中| 日日摸夜夜爽无码毛片精选| 精品国产亚洲第一区二区三区 | 午夜福利电影无码专区| 国产av一码二码三码无码| 久久r999热精品国产首页| 精品动漫一区二区无遮挡| 另类亚洲欧美专区第一页| 国产成人无码av在线播放不卡 | а√天堂中文在线资源库免费观看| 欧美亚洲熟妇一区二区三区| 特级a做爰全过程片| 国产av新搬来的白领女邻居|